Loading...
Back to Services
Termite Control

Pre-Construction Termite Treatment

Professional, safe, and highly effective eradication strategies tailored to protect your home and business.

Pre-Construction Termite Treatment

Overview

The absolute best time to protect a building from devastating subterranean termites is during the construction phase. Our pre-construction soil treatment creates an impenetrable chemical barrier under the foundation, ensuring long-term structural security.

Core Threats

  • Termites invading through microscopic cracks in the foundation
  • Massive financial loss due to unseen structural damage
  • Voided property warranties if unprotected

Signs of Infestation

  • None - this is a preventative measure to secure the building before termites ever have a chance to attack.

Our Treatment Process

1

Builder Coordination

We work closely with your construction team to schedule the treatment precisely after the soil is leveled but right before the concrete slab is poured.

2

Intensive Soil Drenching

We apply a high-grade liquid termiticide to the compacted soil, foundation trenches, and around plumbing penetrations at specified high-volume rates.

3

Warranty & Certification

Upon completion, we issue a long-term warranty and an official treatment certificate, which is often required by building authorities and banks.

Why Choose Our Treatment?

The most cost-effective termite prevention method

Provides a seamless, unbroken barrier under the slab

Increases property value and peace of mind

Frequently Asked Questions

When applied correctly at the right concentration, our premium termiticide barriers can remain effective in the soil for 5 to 10 years or more.
If heavy rain washes away the treated soil before the concrete is poured, a re-treatment of the affected areas will be necessary to ensure an unbroken barrier.
Pest

Need it fixed now?

Our emergency response team is ready to inspect and eradicate the problem.

011 477 7070

Available 24/7 for emergencies